HOME | DD

Published: 2010-11-10 00:54:18 +0000 UTC; Views: 302; Favourites: 3; Downloads: 2
Redirect to original
Description
The bulk of the texture work is done now, though some bits need tweaking.The logo definitely needs to be toned down/shrunk/both, otherwise it's mostly the pump and paint chipping that needs work.